We met at 3:00 PM, starting with shooting at 4:00 PM at Meyer Werft. We had to wait for the darkness, meanwhile, I did some timelapse shoots outside. It was already snowing, and the Sony EX-1 got a little wet. I did not expect this to be a problem, but when I went inside again, and turned the camera off and back on, it won´t start properly. The menu screen showed up for a second, then the camera rebooted. I turned it off, removed every removable accessories and put it down to get dry again.
We were unlucky, because we needed to get some shots, and we decided to take one of the ship´s cameras, which were stored back in the hotel, so we had a delay. Then we continued with the Sony Z5 to do some interviews and insert shots.
After 2 hours, I tried my EX-1 again, worried about all the telephone calls and time needed to get it fixed in case it is broken. But I was lucky, and it turned on again!
We shot lots of interiors, walks and details of the ship, finishing with the recording at 1:00 AM, going into the edit, which was done at 5:00 AM. The material of two different cameras, the little amount of sleep and lots of footage worked out fine, I expected to spent more time on editing.
The work starts to improve, we learn to know each other better and this makes us faster.
This episode won´t get graded, because we need to see how it looks on the web like in its purest form. I´ll try to improve my understanding of our technicial infrarstructure and the look from episode to episode.




















